Log inSign up free
  • Home
  • Jobs
    • Applications
    • Career
    • Resume
    • Cover letters
  • Content
    • Posts
    • Media
  • Messages
  • Analytics
    • Overview
    • Pages
  • Builder
    • Templates
  • More tools
    • Profile
    • Hiring
  • Settings
All jobs
SESeal logo

Seal

Location not stated

Development runs. Tech transfers. Batch reviews. Neil does the legwork. Your team decides..

Skip to main content
Seal
  • Neil
  • Platform
  • Blueprints
  • Industries
  • Customers
  • Company
  • Log in
Book a demo→

Development runs. Tech transfers. Batch reviews. Neil does the legwork. Your team decides.

It reads your runs and records, then drafts the comparison, the gap assessment or the review, so you start from a draft, not a blank page.

Book a demo→Watch Neil answer an email→
Neil › Jobs
4 Neils awake
  • Prepare batch B-2407 for reviewQualityWorking
  • Trace requirements to testsValidationWorking
  • Find the gaps in a tech transferDevelopmentNeeds your input
  • Draft line clearance from SOP-QA-017ManufacturingNeeds your input
  • Compare runs where yield fellDevelopmentReady to review
  • Compare CAPA-301’s event ratesQualityReady to review

QualityWorking

Prepare batch B-2407 for review

B-24072 of 4 readyExecution recordReadySignaturesReadyQC reports2 missingDEV-038Not assessed

Reading the batch recordChecking QC against the specTracing DEV-038 to its batches

Open the job →
50+ companies, from GxP labs to GMP manufacturing.

Every Neil has its own computer.

A Neil for each kind of work, with its own instructions, access and computer. Each works on many jobs at once.

See how CDMOs keep client work separate→
Neil › Personas › Development
awake, 2 jobs
Developmentawake, 2 jobsQualityawake, 2 jobsManufacturingawake, 1 jobValidationawake, 1 jobYour ownnew

Development

Compare development and manufacturing runs, and list what a transfer still needs before the first run.

Access
Development, Manufacturing. Proposes changes.Never more than the person asking it.
Computer
Its own. Keeps the script behind each comparison, so you can rerun it.
Jobs
  • Compare runs where yield fellReady to review
  • Find the gaps in a tech transferNeeds your input
Skills
Run comparisonTransfer gap assessmentScale-upApproved by your team, shared by every Neil.
Signs
Nothing. People sign.

Quality

Check each batch record against its master record and the open deviations, ready for QA to review.

Access
Quality, Manufacturing. Proposes changes.Never more than the person asking it.
Computer
Its own. Keeps the checks it runs on every batch record.
Jobs
  • Prepare batch B-2407 for reviewWorking
  • Compare CAPA-301’s event ratesReady to review
Skills
Batch review briefCoA checkCAPA recurrenceApproved by your team, shared by every Neil.
Signs
Nothing. People sign.

Manufacturing

Configure approved procedures as processes in Seal, step by step, with their limits and checks.

Access
Manufacturing, Processes. Proposes changes.Never more than the person asking it.
Computer
Its own. Keeps its notes on each procedure, step by step, for review.
Jobs
  • Draft line clearance from SOP-QA-017Needs your input
Skills
Procedure to processStep limitsApproved by your team, shared by every Neil.
Signs
Nothing. People sign.

Validation

Trace each requirement to the test that covers it, and list what nothing covers yet.

Access
Validation, Equipment. Proposes changes.Never more than the person asking it.
Computer
Its own. Keeps the script behind each trace, so you can rerun it.
Jobs
  • Trace requirements to testsWorking
Skills
Traceability matrixTest scriptsApproved by your team, shared by every Neil.
Signs
Nothing. People sign.

Your own

The work you hand it, and how your team likes it done.

Access
What you grant it, as you would a colleague.Never more than the person asking it.
Computer
Its own, ready for its first job.
Jobs
What you hand it, many at once.
Skills
The methods your team approves.
Signs
Nothing. People sign.

It shows its work.

Every finding links to the record, version and field behind it. What the records don’t show, Neil says.

Review AI and data controls→
Tech transferBatch reviewCoA checkCustomer formsAuditHandover
Tech transfer › Receiving site
drafted by Neil

What must the receiving site resolve before the trial?

Three transfer gaps to resolve.

Sending process against receiving setup
RequirementSending siteReceiving siteWhere it stands
Hold2–8 °C2–8 °C in procedureMapped
Volume80 L of 100 L600 L of 1,000 LAssess comparability
Mixing300 rpm300 rpm proposedRationale not linked
SamplingOutlet sample pointSide port proposedConfirm suitability
Close ×
Sending-site process

Sending process v04

Hold temperature
2–8 °C
Vessel capacity
100 L
Working volume
80 L
Mixing speed
300 rpm
Sampling
Outlet sample point

The supplied excerpt establishes the requirements to map. It does not contain a receiving-site comparability assessment.

NextThe transfer team assesses comparability and approves the trial.

From Sending process v04, Receiving setup and T-014 plan

Full walkthrough →

What’s missing from this batch review?

Two items still need attention.

What batch B-2407's review needs, and where each item stands
CheckRecordWhere it stands
ExecutionB-2407Complete
SEC purityQC-240798.6%, in spec
Other QC reportsBR-0122 not attached
DeviationDEV-038Assessment pending
Close ×
Batch execution record

B-2407

Execution
Complete
QC evidence
QC-2407 attached
Linked deviation
DEV-038
Review status
Awaiting QA review

Completed execution is one part of the review package.

NextQA reviews the draft and decides.

From B-2407, QC-2407, DEV-038 and BR-012

Full walkthrough →

Does this CoA cover the required tests?

Three results reported. One test missing.

Lot RM-882: the supplier's certificate against the specification
TestSupplier CoASpecificationWhere it stands
IdentityPassRequiredIn spec
Assay99.4%98–102%In spec
Water0.3%≤ 0.5%In spec
Residual solventNot reportedTest requiredMissing
Close ×
Supplier certificate excerpt

CoA RM-882

Material / lot
MAT-012 / RM-882
Identity
Pass
Assay
99.4%
Water
0.3%
Residual solvent
Not reported

The supplied certificate does not report a residual-solvent result. No separate report is included.

NextThe reviewer resolves the missing test, then QA decides.

From CoA RM-882, MAT-012 v03 and Receipt RM-882

Full walkthrough →

Can you fill in this customer questionnaire?

Two answers drafted from your SOPs. One needs you.

Draft customer questionnaire
QuestionDrafted answerWhere it stands
Are changes assessed for customer impact?Yes. Customer commitments and notification requirements are assessed before approval.SOP-CC-012 v05
How do you record training?By employee and procedure version, with completion date and assessment outcome.SOP-TR-003 v02
Last customer audit dateAdd the date from the audit record.Needs your input
Close ×
Procedure

SOP-CC-012 v05

Title
Change control
Section
4.2 Impact assessment
Status
Approved

Before approval, assess changes for product quality, validated state, regulatory filings and customer commitments. Record customer notification requirements in the assessment.

NextQA adds the audit date and approves the answers.

From SOP-CC-012 v05 and SOP-TR-003 v02

Download CSV ↓

Can we show the operators were trained on SOP-021 v03?

One training record still to find.

SOP-021 v03: the evidence the audit question asks for, and what was found
EvidenceRecordWhat it showsWhere it stands
Procedure releasedCHG-062Signed, effective 1 AugustFound
Operator A trainedTRN-114Completed 3 AugustBefore the work
Operator B trainedSearchNo completion located through 5 AugustMissing
Close ×
Controlled procedure

SOP-021 v03

Revision
v03
Effective
1 August
Approval link
CHG-062
Training requirement
Before independent work

The request is specific to this revision and the two named operators’ work on 5 August.

NextQA finds the missing training record, then approves the response.

From SOP-021 v03, CHG-062, TRN-114 and Operator B search

Full walkthrough →

What does the incoming shift need to pick up at 18:00?

The next check is at 18:30.

The runs at the 18:00 handover, and what the incoming shift picks up
RunAt 18:00NextWhere it stands
RUN-402Hold activeCheck at 18:30To assign
RUN-403Issue unresolvedOwner updateOpen
RUN-401Execution completeQA reviewNot released
Close ×
Run status at 18:00

RUN-401

Execution
Complete
QA review
Pending
Next recorded work
QA review
Release
Not released

Execution completion does not mean the batch is released.

NextThe outgoing team checks the brief and hands over.

From RUN-401, RUN-402 and RUN-403

Full walkthrough →

It proposes. Your team releases.

The way engineers ship code: Neil proposes the change, its tests run, QA signs, and the next run follows the rule.

See how continuous validation works→
Neil › Jobs › Post-thaw viability
waiting for QA
  1. MSAT3 Nov, 09:12

    Why is post-thaw viability falling?

  2. Neil09:31

    Longer holds coincide with lower viability. All eight runs stayed within the approved limit.

    Viability by time from thaw to count8 runs
    95%91%
    20 min45 min, the limit

    From the batch records, their timestamps and QA-PROC-014 v04. The records don’t establish a cause.

  3. Neil09:44

    Proposed changeset #14 to QA-PROC-014, for QA to review.

    Step 03: Post-thaw hold

    • Hold timeLimit 45 30 min, thaw to count
    • Over the limitOpens a deviation for QA

    12 of 12 tests passed on v05

  4. QANow

    Awaiting signature

    Sign and release v05
  5. RUN-218Next

    Follows v04 until you release v05.

It checks the work as it’s done.

Every result is read against its limits, its controls and the runs before it as soon as it’s saved. A problem reaches the person who can fix it before anyone signs.

See how CDMOs share checked work with clients→
Neil › Checks › Today
6 to look at
  • 16:40Host cell protein, DS-031Below its limit
  • 16:02Bioburden, pre-filtrationChecked
  • 15:11Potency, 6 months 25 °CControl failed
  • 14:30SEC purity, 9 months 5 °CThird run
  • 12:20pH and osmolality, B-12Checked
  • 10:58Precision qualificationChanged after signing
  • 10:19ELISA on standard RS-77Expired standard
  • 09:47Titre by Protein A HPLCAnother run’s data
  • 31 earlier recordsNothing to raise

ELN-2291Saved 16:40Flagged 16:41

Spike recovery below its limit, marked Pass

  1. 1Reads the result

    ELN-2291, results

    Spike recovery
    46%
    Result
    Pass
  2. 2Opens the method the record cites

    HCP-ELISA v4, section 7.2

    Spike recovery must be within 50 to 150% for a result to be reported.

  3. 3Opens the plate data

    hcp-0412.xlsx, spiked wells, ng/mL

    WellAddedFoundRecovery
    C320.09.246%
    C420.08.844%
    C520.09.648%
  4. 4Flags it at 16:41

    Spike recovery is 46%, below the method’s 50% limit, but the record says Pass. With recovery this low, the lot’s result could be about half the true value.

    To the analyst, before signing.

ELN-2307Saved 15:11Flagged 15:12

Reported from a plate whose control failed

  1. 1Reads the result

    ELN-2307, results

    Sample potency
    98%
    Reported to
    Stability summary SS-01
  2. 2Opens the method’s control limit

    POT-CB v2, section 6.1

    The reference standard’s EC50 must fall within 1.5 to 3.0 ng/mL, or the plate is invalid.

  3. 3Opens the plate reader’s export

    pot-0917.csv, curve fits

    CurveEC50, ng/mLR²
    Reference3.90.991
    Sample3.30.994
  4. 4Flags it at 15:12

    The reference standard failed its limit, so this plate can’t give a valid potency. Its 98% is already in the stability summary.

    To the analyst and the stability lead, before the summary is signed.

ELN-2351Saved 14:30Flagged 14:30

A third run of a sample that failed twice

  1. 1Sees a run of a sample tested before

    ELN-2351, started 14:30

    Sample
    STB-09-05
    Test
    Purity by SEC, 9 months
  2. 2Finds the earlier runs

    Records for STB-09-05

    RecordPurityComment
    ELN-234093.1%Invalid, retest
    ELN-234493.4%Invalid, retest
  3. 3Opens the stability protocol

    STP-12, table 2

    Purity by SEC: at least 95.0% at every time point.

  4. 4Looks for an investigation

    Deviations, STB-09-05

    Open
    None
  5. 5Flags it at 14:30

    Two results below the 95% limit were set aside with no cause recorded, and no investigation is open. This point needs one, not a third run.

    To the analyst and quality, as the run started.

ELN-2368Saved 10:58Flagged 10:59

A signed Fail, unlocked and now a Pass

  1. 1Reads the record’s history

    ELN-2368, audit trail

    WhenWhat
    Yesterday 11:20Version 3 signed: Fail
    Today 10:58Replicate 4 removed, no reason
    Today 10:58Version 5: Pass, not signed
  2. 2Recalculates with every replicate

    ELN-2368, replicates, % of label

    123456RSD
    101.696.898.6118.998.7102.77.9%
    101.696.898.698.7102.72.4%
  3. 3Opens the qualification protocol

    QP-031, section 5.3

    Intermediate precision: RSD no more than 5.0%. A result is excluded only with a documented cause.

  4. 4Flags it at 10:59

    A signed Fail became a Pass when replicate 4 was removed with no reason given. With every replicate counted, precision is 7.9% against a 5.0% limit.

    To quality and the first reviewer, before it’s signed again.

ELN-2433Saved 10:19Flagged 10:20

One expired standard behind three studies

  1. 1Reads the reagents used

    ELN-2433, reagents

    Reference standard
    RS-77
    Kit lot
    K-5512
  2. 2Finds every run on RS-77

    Records using RS-77

    RecordRunControl
    ELN-241014 Oct0.82
    ELN-241521 Oct0.79
    ELN-2433Today0.71
  3. 3Opens the certificate and the log

    RS-77 certificate, storage

    Use within 60 days of opening. The reagent log has it opened on 12 August.

  4. 4Flags it at 10:20

    Three studies used RS-77 after its use-by date of 11 October, and its control has fallen in every run. The two that passed may be affected too.

    To all three teams.

ELN-2452Saved 09:47Flagged 09:48

Raw data from a different study

  1. 1Reads the record

    ELN-2452, run

    Run
    Today
    Samples
    P-2452-01 to 06
  2. 2Opens the attached file

    titre-0814.cdf, instrument header

    Acquired
    14 Aug, 09:12
    Samples
    P-2219-01 to 06
  3. 3Finds where the file belongs

    ELN-2219, raw data

    File
    titre-0814.cdf
    Peak areas
    The same as today’s
  4. 4Flags it at 09:48

    The raw data attached here comes from a study run on 14 August. Today’s results have no raw data behind them.

    To the analyst, as the file was attached.

Ready for the inspector’s questions.

The questions inspectors ask about AI in GMP work, answered by how Neil works.

Who made this decision?
A person. Neil drafts and proposes. It signs, approves and releases nothing.
What is this based on?
The records. Each finding links to the record, version and field behind it.
What didn’t it find?
It says so. Neil names what the records don’t show. It doesn’t fill the gap.
Could the AI change the process?
Only by proposing. The change’s tests run, then your team releases it.
What could it see?
What you grant it. Never more than the person asking.
Does our data train the model?
No. Under Seal’s agreements, it isn’t used to train the underlying models.
How Neil fits Annex 22→

Neil works in your Word, Excel and PowerPoint files.

Open Neil in the document you’re working on, with nothing to upload or paste. It changes the file only once you accept edits. You check the change and save.

Install Neil for Office→

Give Neil a real job.

Start with the work that takes your team longest. Each job shows what Neil reads and the draft it returns.

  • STAB-016Assay %10595100.298.997.4Initial3 mo6 mo9 moLabReview a stability trend
  • INJ-103Impurity peakOriginal0.18%Reprocessed0.12%ReasonBaselineReviewMissingLabCompare chromatography integration changes
  • Batch 205kgChargedCHARGE-205100.0ProductOUTPUT-205−96.0SamplesSAMPLE-205−1.0ResidualLOSS-205−2.0Unexplained1.0ManufacturingTrace a material-balance discrepancy
  • LOG-204Container C28 °C10:1010:4232 minManufacturingTrace a cold-chain excursion
  • DEV-04214 min logged09:12Temperature alarm09:18Operator acknowledged09:26Back in rangeProduct assessmentNot recordedQualityDraft a deviation investigation
  • AT-309Sample identity10:00S-91Recorded10:06S-19CorrectedReasonTranspositionLabel imageNot attachedQualityPrepare a GxP audit-trail review
Book a demo→All 52 jobs→
Seal

Every GxP run better than the last.

London Bridge, UKMenlo Park, CAResearch Triangle Park, NC
Opvia Ltd.
Product
NeilPlatformInstrumentsRegulatoryIntegrationsLog in
Systems
QMSMESELNLIMSSDMSInventorySee all systems
Workflows
Batch releaseTech transferDeviation and CAPAStabilityDocument controlChange controlSee all workflows
Industries
Cell and gene therapyBiotechCDMOMedical device503B compoundingBiobanking
Company
CustomersMissionCareersContactNeil for Office support
Legal
PrivacyNeil for Office EULA

Copyright 2026 Seal.

Pay
Not stated
Where
Not stated
Work
Not stated
Type
Not stated
Posted
5 Nov, 2026
Apply on the original postingSign in to apply

Unverified board

more at Seal.

5 Nov, 2026

Seal

Sales Development Representative

SESeal logo
  • Sales & Marketing

Location not stated

Salary not listed

Details
5 Nov, 2026

Seal

Business Development (BDR)

SESeal logo
  • Sales & Marketing

Location not stated

Salary not listed

Details
5 Nov, 2026

Seal

Log in

SESeal logo

    Location not stated

    Salary not listed

    Details

    similar roles.

    2 Nov, 2026

    PIC

    Senior Actuary - 12 month fixed term contract

    PIPIC logo
    • Full time
    • Senior level

    London +2

    Full time

    Details
    4 Nov, 2026

    Parallel Employment

    Packing or Production All shifts $17 an hour

    PEParallel Employment logo

      Elma Center +2

      Salary not listed

      Details
      4 Nov, 2026

      Parallel Employment

      1st shift Lumber Mill Worker- Ellicottville NY

      PEParallel Employment logo

        Arcade +2

        Salary not listed

        Details
        5 Nov, 2026

        OpenWorks Engineering

        Goods Inward Operator

        OEOpenWorks Engineering logo
        • Full time

        Prudhoe +2

        Full time

        Details
        4 Nov, 2026

        DiaSys Deutschland Vertriebs-GmbH

        Technische Assistenz der Geschäftsführung (m/w/d) mit Schwerpunkt Projekt- / Integrationsmanagement

        DDDiaSys Deutschland Vertriebs-GmbH logo
        • Full time

        Iffeldorf

        Full time

        Details
        2 Nov, 2026

        DiaSys Deutschland Vertriebs-GmbH

        Ausbildung zum Industriekaufmann (m/w/d)

        DDDiaSys Deutschland Vertriebs-GmbH logo
        • Full time

        Holzheim

        Full time

        Details